Skip to content
HomeCalcify

Sod Calculator

To calculate sod, multiply your lawn length by width for the square footage, then add 5–10% for waste and cuts. Divide by the piece size (about 2.66 sq ft) or by ~450 sq ft per pallet. A 40×25 ft lawn needs about 1,050 sq ft of sod — roughly 3 pallets.

1 pallet covers
~450 ft²
Slab size
16×24 in (2.66 ft²)
Waste to add
5–10%

Your measurements

Enter your measurements

Fill in the fields to see your estimate.

The formula

Sod (ft²) = Length × Width × (1 + waste %); Pallets = area ÷ 450

How to calculate it manually

  1. 1

    Measure the lawn

    Multiply length × width. Split irregular yards into rectangles and add them.

  2. 2

    Add waste

    5% for square lawns, 10% for curves, slopes, and obstacles.

  3. 3

    Convert to pieces or pallets

    Divide by 2.66 ft² for pieces, or by ~450 ft² for pallets.

  4. 4

    Order fresh

    Sod is perishable — order to arrive the day you install, and lay it within 24 hours.

Example calculation

A 40 ft × 25 ft lawn: 1,000 ft² × 1.05 = 1,050 ft² ≈ 395 pieces or 3 pallets.

Sod cost by lawn size

Material only, at $0.35–$0.85 per sq ft.

Lawn sizeAreaSod cost
20×20 ft400 ft²$140 – $340
40×25 ft1,000 ft²$350 – $850
50×50 ft2,500 ft²$875 – $2,125

Common sod estimating mistakes

Ordering too early

Sod dries out fast. Time delivery for install day and keep it shaded and moist until laid.

Skipping soil prep

Sod needs loose, graded, raked soil — ideally with a topsoil layer — to root well.

Forgetting the waste factor

Cuts around beds, walks, and curves waste sod. Add 5–10%.

Frequently asked questions

Ready to start your landscaping project?

Run the numbers above, then explore related tools and guides to plan every step.